We’ve been on eCW since 2007 and have the Multim database. I’ve understood from other users that changing to Medispan is beneficial. In discussion with eCW, we have been told that for the conversion to proceed, all the flow sheets and order sets are deleted. This means that all the flowsheets and order sets need to be recreated from scratch. The scope document says that Medispan medications need to be added to some areas post-conversion but it doesn’t say that the items (flow sheets and order sets themselves) will be deleted. I understand that Medispan medications would need to be added but is it correct that the flowsheets and order sets themselves are all deleted?
Can someone who has been through the conversion help me out? Thank you